THAW
Wake the system. Soil tests, pruning, grafting, seed starting, swale inspection, and repair after winter.
A working calendar that follows the place, not the market. Four cycles of propagation, growth, preservation, and repair—with public events posted when they are confirmed.
This is a standing framework, not a promise of programming. The tasks shift with weather, labor, and what the land actually needs.
THAW / PEAK / DESCENT / DORMANCY
Wake the system. Soil tests, pruning, grafting, seed starting, swale inspection, and repair after winter.
Maximum light and labor. Plant out, build, harvest, run workshops, and keep the water moving.
Close the loops. Preserve the surplus, save seed, rebuild compost, sheet-mulch, and put the beds to rest.
Low light, slow work. Tool repair, infrastructure planning, archive maintenance, reading, and study.
Workshops, field days, and builds are announced through the signal first. If you want to host something, open a channel.